LYGH-800 Rebar Cage Rolling Machine Makes a Grand Debut, Leading the Innovation in Rebar Cage Processing for Infrastructure Construction
Recently, the LYGH-800 Rebar Cage Rolling Machine, specially developed to address pain points such as low efficiency and poor precision in rebar cage processing in the infrastructure field, has been officially launched on the market. Jointly developed by Shandong Zhongji Luyuan Machinery and a university research team after two years of intensive research, this equipment has redefined the standards for rebar cage processing with a number of innovative technologies, injecting new impetus into the high-quality development of China's infrastructure industry.
In traditional infrastructure construction, rebar cage processing has always been a key link restricting project progress. In the past, rebar cages mostly relied on manual binding or processing with simple equipment, which not only required a large number of laborers but also resulted in low processing efficiency. Taking a rebar cage with a diameter of 2 meters and a length of 12 meters as an example, the traditional processing method required 8-10 workers to work continuously for 12 hours to complete one set. Moreover, affected by manual operations, the error in the spacing of the steel bars in the rebar cage often exceeded 5 millimeters, and the welding quality was unstable. Problems such as poor bonding during subsequent concrete pouring were prone to occur, posing hidden risks to the structural safety of the project. At the same time, during manual processing, workers had to bend over for a long time and carry heavy steel bars, resulting in high labor intensity and a relatively high risk of safety accidents. As China's infrastructure projects move towards larger-scale and more refined development, the traditional rebar cage processing method can no longer meet the project's requirements for efficiency, precision, and safety.
It is worth mentioning that the LYGH-800 has strong adaptability. It can process various types of rebar cages with a diameter of 230 millimeters to 800 millimeters and a length of 3 meters to 24 meters, meeting the needs of different infrastructure scenarios such as bridge pile foundations, subway tunnels, and high-rise building foundations. At the same time, the equipment adopts a modular design, with strong universality of components, convenient later maintenance, and maintenance costs reduced by approximately 30% compared with similar equipment.
At present, the LYGH-800 Rebar Cage Rolling Machine has been put into use in a number of key infrastructure projects. In a cross-river bridge project, this equipment processes an average of 8 sets of rebar cages per day, saving 60% of labor costs compared with traditional processing methods and shortening the rebar cage processing cycle of the project by 40 days. Moreover, the rebar cages processed have passed third-party testing, and all indicators are better than the design standards. The chief engineer of the project sighed, "The LYGH-800 from Zhongji Luyuan Machinery not only solves our problem of tight construction schedules but also provides a solid guarantee for the quality of our project."